Oldham 6th Form College Arts Department and Duncan Lawton Building Work underway by BE Boys Rossendale.
Work is now well underway at Oldham 6th Form College, where B and E Boys have been nominated as Main Contractors by Project Managers AA Projects, Manchester.
The work comprises of two steel frame extensions to the Art Department and Duncan Lawton Buildings, with glazed curtain walling, and Alucabond cladding as well as internal re-modelling and alterations to existing mechanical and electrical services. Externally all tarmacadam surfaces are to be removed and replaced with block paving and surface drainage.
Oldham 6th Form College which is located close to the new Metro Station and Oldham College, will remain in operation during the works which have been carefully phased to allow progress to continue during the academic year.
B and E Boys have undertaken many projects in Educational Establishments during term time ensuring progress and safety are maintained at all times.
B&E Boys were established in 1961 and have been undertaking construction projects throughout the North West and beyond in both public sectors and for Private Enterprise