J2 Hydro
Return to project listingsSituated in Bury, Lancashire
To create a concrete channel and generator house alongside the River Roch to accommodate a 75kw hydro electric turbine
Works included re-grading of the river bed, installation of cofferdams and temporary support works to enable excavation of a 5m wide channel to a depth of 6m, of which 2m were below the water level. Techniques were employed to enable over 100 cubic metres of concrete to be cast alongside a river, creating a new water channel, co-ordinating the lifting of an Archimedes screw into position and then finally grouting into position.
J2 Business Park, situated near B&Q Warehouse Bury on the M66, is home to The Bury Black Pudding Co. Ltd who utilise much of the electricity generated.
The original water workings date back to 1766 and a date stone has been retained in original position as part of the new installation.
Project Specifics
Project Value
£400,000
Contract Period
18 weeks
Consultants
TJB Associates Rochdale
Client
Hallidays Hydropower